Phase 2 Items:
Items Covered in Phase 2 <--Click Here to see list
- Installation of Flooring throughout Basement
- Repairing of Walls throughout Basement
- Painting Walls Throughout Basement
- Repairing of Ceilings in Basement
- Rapairing/Replacing of lighting/electric as Needed in Basement
- Replacement of Front Door
- Installation of Handicap Ramp
- Installation of Blinds in Esther's Office
- Rapair/Repaint Garage Doors
- Create Information Center for Kitchen
- Install Electronic Lock for Basement Door
- Install Deadbolt Locks for Offices, boiler room, and 2nd Floor
- Install Matching Deadbolt Locks for all Exterior Doors
Click On Each Item Below To See The Details of the Estimate
$8540
$1768
$418
________
$10,726
$1768
$418
________
$10,726